Pilots helping pilots
View over 100 airline profilesAdd to Google



Go Back   Airline Pilot Central Forums > Airline Pilot Forums > Regional
Register FAQ Advertising Members List Calendar Mark Forums Read


Regional Regional airlines

Reply
 
LinkBack (1) Thread Tools Display Modes
Old 02-03-2009, 11:09 AM   1 links from elsewhere to this Post. Click to view. #1 (permalink)
On Reserve
 
Joined APC: May 2008
Posts: 22
Default Freedom JFK Base Closes May 2nd

We have received word that Delta is going to relocate our entire operation to KCVG beginning May 2nd, 2009. We have certainly seen an improvement in our JFK operation however; I feel we will be an even better airline when we have all our resources operating out of one location. The CVG hub will provide a much better operating platform for us as it is away from the northeast airspace, ATC delays, and limited gate space. I expect this move to have a very positive impact on Freedom and our people for the long term.



We are aware that some of you have come to know New York as home. We also realize that the base relocation to CVG may have a significant impact on your way of life and that of your families too. Our decision is driven by our partner’s needs and long term strategy. Undertaking such a dramatic operational move is challenging for the company as well. It’s paramount that we remain flexible and continue to work together to do our best to maintain optimal operational status.



The flight crew base will be reduced over the next few months in waves however will officially close May 2nd ending with bid 09-05. The maintenance and ground support base will close at the end of the operating day on May 1st, 2009. Please look for more detailed information to come out from each department on specific procedures for the closure and options you will have.



Feel free to contact me with any questions. As always, thanks for your understanding, hard work and support.
skyguy is offline   Reply With Quote
Old 02-03-2009, 11:11 AM   #2 (permalink)
Gets Weekends Off
 
Joined APC: Nov 2005
Position: CL-65 F.O.
Posts: 533
Default

Quote:
Originally Posted by skyguy View Post
We have received word that Delta is going to relocate our entire operation to KCVG beginning May 2nd, 2009. We have certainly seen an improvement in our JFK operation however; I feel we will be an even better airline when we have all our resources operating out of one location. The CVG hub will provide a much better operating platform for us as it is away from the northeast airspace, ATC delays, and limited gate space. I expect this move to have a very positive impact on Freedom and our people for the long term.



We are aware that some of you have come to know New York as home. We also realize that the base relocation to CVG may have a significant impact on your way of life and that of your families too. Our decision is driven by our partner’s needs and long term strategy. Undertaking such a dramatic operational move is challenging for the company as well. It’s paramount that we remain flexible and continue to work together to do our best to maintain optimal operational status.



The flight crew base will be reduced over the next few months in waves however will officially close May 2nd ending with bid 09-05. The maintenance and ground support base will close at the end of the operating day on May 1st, 2009. Please look for more detailed information to come out from each department on specific procedures for the closure and options you will have.



Feel free to contact me with any questions. As always, thanks for your understanding, hard work and support.
Thats interesting......
RiddleEagle18 is offline   Reply With Quote
Old 02-03-2009, 11:23 AM   #3 (permalink)
Gets Weekends Off
 
TurboDog's Avatar
 
Joined APC: Mar 2008
Posts: 898
Default

Does this mean something came out with the injunction?
TurboDog is offline   Reply With Quote
Old 02-03-2009, 11:28 AM   #4 (permalink)
Viking Warrior
 
Diver Driver's Avatar
 
Joined APC: Mar 2007
Position: Furloughed
Posts: 1,662
Default

Quote:
Originally Posted by TurboDog View Post
Does this mean something came out with the injunction?
Nothing on the appeals court website yet.
Diver Driver is offline   Reply With Quote
Old 02-03-2009, 11:30 AM   #5 (permalink)
Gets Weekends Off
 
The Duke's Avatar
 
Joined APC: Jan 2008
Position: DHC-8 Captain
Posts: 253
Default

No, still waiting to hear from the court in Atlanta...
The Duke is offline   Reply With Quote
Old 02-03-2009, 11:32 AM   #6 (permalink)
Gets Weekends Off
 
The Duke's Avatar
 
Joined APC: Jan 2008
Position: DHC-8 Captain
Posts: 253
Default

Quote:
Originally Posted by Diver Driver View Post
Nothing on the appeals court website yet.
Ya beat me to it, I was almost certain we'd lost when I saw the company e-mail indicating JFK base closure.
The Duke is offline   Reply With Quote
Old 02-03-2009, 01:11 PM   #7 (permalink)
On reserve forever
 
flycrj200's Avatar
 
Joined APC: Dec 2007
Position: Some Beach
Posts: 1,023
Default

Quote:
Originally Posted by skyguy View Post
We have received word that Delta is going to relocate our entire operation to KCVG beginning May 2nd, 2009. We have certainly seen an improvement in our JFK operation however; I feel we will be an even better airline when we have all our resources operating out of one location. The CVG hub will provide a much better operating platform for us as it is away from the northeast airspace, ATC delays, and limited gate space. I expect this move to have a very positive impact on Freedom and our people for the long term.



We are aware that some of you have come to know New York as home. We also realize that the base relocation to CVG may have a significant impact on your way of life and that of your families too. Our decision is driven by our partner’s needs and long term strategy. Undertaking such a dramatic operational move is challenging for the company as well. It’s paramount that we remain flexible and continue to work together to do our best to maintain optimal operational status.



The flight crew base will be reduced over the next few months in waves however will officially close May 2nd ending with bid 09-05. The maintenance and ground support base will close at the end of the operating day on May 1st, 2009. Please look for more detailed information to come out from each department on specific procedures for the closure and options you will have.



Feel free to contact me with any questions. As always, thanks for your understanding, hard work and support.
Where are you getting this information from?
flycrj200 is offline   Reply With Quote
Old 02-03-2009, 01:19 PM   #8 (permalink)
Gets Weekends Off
 
Avroman's Avatar
 
Joined APC: Feb 2008
Position: CRJ 900 Captain
Posts: 663
Default

Anyone want to bet this coincides with Mesaba moving the 5 900's from SLC to JFK???
Avroman is offline   Reply With Quote
Old 02-03-2009, 01:52 PM   #9 (permalink)
Gets Weekends Off
 
ExperimentalAB's Avatar
 
Joined APC: Apr 2007
Position: CRJ, future C-130
Posts: 3,328
Default

I wouldn't doubt it...DCI-shuffle is more fun than chinese-firedrills
__________________
Fly 'er like you're with a woman.
ExperimentalAB is offline   Reply With Quote
Old 02-03-2009, 03:03 PM   #10 (permalink)
On Reserve
 
Joined APC: May 2008
Posts: 22
Default

I am getting real sick of the DCI shuffle that is for sure!
skyguy is offline   Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

LinkBacks (?)
LinkBack to this Thread: http://www.airlinepilotforums.com/regional/36503-freedom-jfk-base-closes-may-2nd.html
Posted By For Type Date
Regional on Airline Pilot Central Forums | BoardReader This thread Refback 02-10-2009 03:51 AM


All times are GMT -8. The time now is 11:20 PM.


Copyright ©2000 - 2009 Internet Brands, Inc.

Search Engine Optimization by vBSEO 3.2.0 RC7