View Single Post
Old 02-08-2013, 07:15 AM
  #24  
kc135rflyr
On Reserve
 
Joined APC: Aug 2009
Posts: 24
Default

Originally Posted by IADBLRJ41 View Post
Two questions:

1. Is it fair to assume that many of the 756 openings are due to the Contract requirement for an IRO for international? Example would be EWR-DUB now requires 3 pilots?

2. How far out do the openings project forward? End of year or to a certain time in 2013.

Thanks.. Still hoping for a call someday
This bid was for 2/14 ie everybody should be where they are by the end of Feb, 2014. Looking at PBS lines awarded for this month, there were only 13 guys on reserve in IAH on the 75...this leads to either very efficient scheduling, LUCK, or a lot of JR manning.

UAL on both sides is very understaffed and WAY WAY WAY behind the power curve as far as hiring. IMHO even if the CAL side filled all these unfilled FO vacancies tomorrow, they'd still not have enough to fight the new FAA and contract rules. They'll also be losing UAL retreads that go back to the UAL side from our recall, but honestly, unless those guys are volunteer furloughs that want to go back to the 74 or 77 or CAP, they can hold a better line and bigger aircraft at the CAL side than going back to the POS...I mean BUS at UAL.

So the long and short of it is that UAL is in big trouble hiring wise and the flood gates are gonna have to open very soon. We all want you here just as bad, if not more so than you want to be here! Good luck and don't give up!!
kc135rflyr is offline