Originally Posted by
Pedro4President
He means to say they were "awarded" DFW. Their transfer date is TBD. Some have waited as long as ten months last year when we were a bit more stagnant. I would be shocked if it was that long. My guess based on the last flow plan is 6-8 months and it could be shorter. I will say ORD guys are getting the transfer before the LGA guys so that might be something to think about. ORD is shrinking and LGA is growing so that played apart. I'm not sure if that will have an impact on future transfers.
Everyone in my Jan 30th class that wanted DFW was awarded it before training was over. Flow plan has us going to DFW Aug 1st. Most of the class doing IOE now.