View Single Post
Old 01-11-2019, 06:46 PM
  #8  
Scoop
Super Moderator
 
Joined APC: Dec 2007
Position: DAL 330
Posts: 6,868
Default

I heard that there is talk of opening the 320 base in LAX with minimal crews to start the 6 month clock ticking on a new base. This would subsequently open the door allowing for breaking seat locks - new category.



I understand that the company wants to minimize training but this would only work if the next big AE was more than 6 months down the road. If there is a MOAB in April or May it would still be a new category?



I don't know what to think about this rumor but, I see it as a CR technique in the future used to minimize Pilots breaking seat locks. Any contract Ninjas know if we have some sort of PWA protection against this sort of contractual end around?



Scoop
Scoop is offline