View Single Post
Old 02-21-2019, 12:42 PM
  #4  
JasonR
Line Holder
 
Joined APC: Mar 2017
Posts: 59
Default

The .297 check is (by title of the section of the part) only required of the PIC. However, 135.245(c)1 requires instrument currency of the SIC which is done by IPC in my shop, and I would imagine others as well. The people who are arguing that a .297 is required probably are just regurgitating what is being told to them if they are also required to do an IPC.
JasonR is offline