Originally Posted by
Flyboy68
This is confusing. With 140 or so aircraft, why so long to upgrade still?
ExpressJet is only operating what they can (barely) staff, which is currently around 100 aircraft. This is including the CRJ, which is going away soon.
The plan is to bring the E145 fleet up to 126, staffing permitting, while also fully staffing the 25 175’s this year. The E175 staffing is the higher priority.
Upgrade for a new hire will likely be very different from the 7+ year waits that people experienced in the past.
Upgrade time dropped 2.5 years in the recent bid, and future bids should cause it to drop significantly as well.