Originally Posted by
Jecain7
I think if SAP goes away that may change some of their minds. The 17/18 days off may not be possible with pbs.
That depends on your PBS. 17 days off (or close) is pretty standard at 9E. Other PBS-bidding airlines, not so much. Make sure your MEC controls it.