View Single Post
Old 05-19-2020, 02:31 PM
  #8  
aeroengineer
Gets Weekends Off
 
aeroengineer's Avatar
 
Joined APC: May 2016
Posts: 324
Default

Originally Posted by Duffman View Post
It really looks like Moderna is onto something with their vaccine ending phase 2 this summer and possibly being approved for the public next winter.

Plus JNJ is already building a facility to mass manufacture vaccines 24/7 by early 2021.
https://www.fiercepharma.com/manufac...vid-19-vaccine
I'm not sure if they're counting on the mass production of their own vaccine to eclipse other vaccines that may get approved earlier, but won't be as widely available, or if they'd be willing to partner with Moderna or someoone else to bring their vaccine up to speed faster (or if that's even technically possible, I'm not a pharmacist but I'd imagine that could be like converting a Boeing factory to an Airbus factory).

Either way, if a vaccine can be widely disseminated before the economy core locks from defaulted loans, small business failures, and unemployment, then this might be the "V" recovery we're all hoping for.
Whatever we do don't let our guard down given a potential second wave this fall.

And hopefully all of us will remember the lessons learned and we do everything we can to mitigate the environment that supports transmission of these pathogens in the future especially with respect to air travel. Even the people who still have jobs have had a lot of family members who have lost their job and one paycheck doesn't cut it. Hammer China to get and keep their house in order with respect to their labs, wet markets etc. so we're less likely to face this again and for heavens sake bring critical manufacturing back to the U.S.
aeroengineer is offline