Interesting thoughts, with some good discussions in the comments. This would be a huge gain in efficiency for the company, which I'm all for. Good time to snag some QOL gains, while protecting jobs, out of such a change in our fleet. I'd like to see a cut in the top of the line construction window. An added bonus would be applying ALV+15 to SWP/SWF.