Logging King Air SIC
#1
Line Holder
Thread Starter
Joined APC: Jan 2013
Posts: 44
Logging King Air SIC
I logged a few hrs turbo as SIC and now realize the Kingair was single pilot certified. I am interviewing with eagle in 2 weeks and filling out there packet that divides hours. Question is do I include the time
#3
Line Holder
Thread Starter
Joined APC: Jan 2013
Posts: 44
Hrs where logged 135. There is no distinction on the application. Our 135 company is starting CRM training so flights where added when clients elected two pilots to be up front, though technically only one is required.
#4
Gets Weekends Off
Joined APC: Mar 2011
Posts: 290
If it is single pilot certified, and you are not qualified to be in PIC in the a/c, I would not log the time. Besides, if it's just "a few hours" as you stated, I don't think it will make or break your interview. You could always mention you have some experience flying a King Air.
#5
If it is single pilot certified, and you are not qualified to be in PIC in the a/c, I would not log the time. Besides, if it's just "a few hours" as you stated, I don't think it will make or break your interview. You could always mention you have some experience flying a King Air.
But if it was 135 operations, and the OPSPEC required an SIC, and the pilot was trained and authorized to serve as SIC in that operation it would be legal.
#7
Gets Weekends Off
Joined APC: Jul 2010
Position: Flying a desk, for good.
Posts: 208
#8
Gets Weekends Off
Joined APC: Jul 2008
Position: CRJ
Posts: 109
I have the same question, I have about 5 hours in a 350. In my situation it was all part 91 and the PIC is a MEI. I logged it as dual received and he let me fly the whole thing. Does this sound ok to you guys?
#9
Line Holder
Joined APC: Jul 2011
Position: moving along
Posts: 52
When it comes to logging SIC, FAR 135.267 is often overlooked.
(2) If flight time is assigned during this period, that total flight time when added to any other commercial flying by the flight crewmember may not exceed--
(i) 8 hours for a flight crew consisting of one pilot; or
(ii) 10 hours for a flight crew consisting of two pilots; and
(3) If the combined duty and rest periods equal 24 hours.
Simply put, if you are assigned flight time greater than 8 hours, an SIC is required. Even if it is a Cessna 152, you can log all SIC time as long as you are appropriately rated in category, class, and type if necessary. This is why companies such as Ameriflight fly Metroliners single pilot and other freight outfits that are geared more toward on-demand freight, such as car parts rather than UPS/DHL feeder flying, fly them 2 pilot and all the SIC time is 100% loggable if their flying hours exceed 8 hours.
When it comes to part 91, I believe the often repeated "SIC required if no autopilot is used, etc" stands true.
#10
5 hours dual is perfectly reasonable.
But if it were 50 hours, or God-forbid 300 hours, then the legitimacy of the instruction received, and therefore the time logged, would be in serious doubt.
However...regional interviewers will often focus in on the most sophisticated aircraft in your logbook. Conventional wisdom is that you'll need to know procedures and systems well, and they may try to assign you to an interviewer with King Air experience. You may want to weigh the benefit of those 5 hours against the need to learn all the systems.
Thread
Thread Starter
Forum
Replies
Last Post