Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Cargo (https://www.airlinepilotforums.com/cargo/)
-   -   FDX - Post Peak Vacancy Bid? (https://www.airlinepilotforums.com/cargo/46178-fdx-post-peak-vacancy-bid.html)

KnightFlyer 12-03-2009 07:17 AM

The new flight time/duty times rules, whenever they come out, will come into play on manning.

The switch to Flag, whenever that happens, will come into play on manning.

Gunter 12-03-2009 07:19 AM


Originally Posted by KnightFlyer (Post 720447)
The new flight time/duty times rules, whenever they come out, will come into play on manning.

The switch to Flag, whenever that happens, will come into play on manning.

The 2012 olympics and the great economic expansion of 2013 will also help.

AFW_MD11 12-03-2009 07:33 AM

this is the critical question


Originally Posted by Gunter (Post 720442)
Will freight fall off after peak or stay up?

if the freight falls off, and we go back to being "overmanned" like the company insists that we are.....and we keep getting more 757s to replace the Airbuses..

possibly a vacancy bid to fill 757 seats and at the same time an excess on the Bus due to the company getting rid of the Bus's that the 757s are replacing???

FDXLAG 12-03-2009 07:54 AM

It depends on the arbitrator.

Daniel Larusso 12-03-2009 08:42 AM


How many retirements? How many 757s coming? Will freight fall off after peak or stay up?
The real question here is what are the company's planned block hours for the next year? That's the heart of manning requirements. They keep those numbers close to the vest. I suspect that sometime in Jan-Feb, they will review this year's peak and other numbers, come up with a working 2010 plan, and go from there on bids. 777 and 757 bids with no secondaries don't hurt their 4.a.2.b case in their opinion so those should be no brainers-they basically said so in the last bid.


I see a vacancy for ANC. They draft too much and the MEM bidpack is nearing normal line averages.
Looking at their press releases and other talk, they seem pretty convinced that the 777 will allow them to overfly ANC quite a bit. We'll see if that's true or not, but I don't see them adding to ANC until they've had a chance to test their theory.


More than a few 727 CAs and widebody FOs have to upgrade to create secondaries for 727 FOs and SOs to fill.
That's going to be interesting. The 727 is in a state of excess and will be until it goes away. It has been for years, it's just more noticeable now with no upward and plenty of backward movement. I think the company operating fleet thing says they're only using about 45-50 of them right now. Will the company fill secondaries in the front seats when those people move out, or will they just let the line averages in the front seats increase in an attempt to minimize 727 training costs by making S/O's wait until they can hold something else? While nothing is perfect and I'm sure they will have to fill some secondaries over time, without a big uptick in the economy it seems likely forcing their hand, why wouldn't they do this?

In fact if things don't get better for a long time, I could see a situation where the company is actually hiring into the 757 right seat with S/O's still stuck in the back of the Deuce. Since we have no control over when they company trains an award, they could excess the whole 727 a long time before it goes away for good and then subsequently post a 757 vacancy bid. The S/O's would likely hold a 757 right seat bid with a training date beyond what a newhires would have on the plane, getting POP(yes, again!) Unless the economy forces their hand, they're going to shut that plane down as economically as possible, they've already shown that.

OR and PC have been mums the word on pretty much everything lately bc of peak. However I expect one or both of them will give us another 'loveline' after peak giving us their vision of the 'horrors' before us. It shouldn't be long before we have some new stuff to speculate on. :)

DLax85 12-03-2009 08:59 AM


Originally Posted by Daniel Larusso (Post 720500)
...In fact if things don't get better for a long time, I could see a situation where the company is actually hiring into the 757 right seat with S/O's still stuck in the back of the Deuce....Since we have no control over when they company trains an award, they

Can the company hire directly into the 757 FO seat without first having a vacancy bid in which all the slots go unfilled?

The Purple Nuggets in ANC were hired directly because there were approximately 68 vacant FO seats in ANC after the big Mar 2006 Vacancy Bid.

And you are right, if the Company did direct hire into the 757 FO seat without first offering it to all the 727 SOs on property, it would be Passover Pay for all (250+) once the first direct hire checked out in the seat.

Given that internal training costs appear to mean little to the company and their current aversion to inverted seniority/seat lists and passover pay, I can't believe that makes any sense.

Daniel Larusso 12-03-2009 09:54 AM


Can the company hire directly into the 757 FO seat without first having a vacancy bid in which all the slots go unfilled?
No, that's why the scenario I proposed included a vacancy bid. For simplicity sake, let's just say the list looks like it will after all of the excess training in completed in 2010. If the company were to excess the entire 727 without announcing a furlough or vacancy bid, the pilots in all three seats who couldn't hold anything else would be awarded the highest paying seat in the US(can't be excessed to an FDA). For the SO's and many of the FO's, the highest paying seat would be 757FO. That would be awarded along with training dates(probably false). The company then would post an additional 757 FO vacancy bid that would obviously go unfilled creating a need for newhires. After the excess bid closes, all positions on the 727 cease to exist as far as vacancy bidding is concerned. The training dates for the 727's guys get pushed back so that the company can keep enough people around to closeout the plane, the newhires cover the additional 757 flying and provide training float as the 727 guys train over.

Haywood JB 12-03-2009 11:14 AM

I heard from one of the cmv classes, we are going to park some 40 Airbuses after the first. Also, the move to flag is supposed to start January 1st. The flag movement should make the 11's lines a little better for international crew rest, and an increase in crew member requirements.

I would assume the 75 will have some sort of bid next year, since it is getting 1.5 airplanes a month, pretty much indefinately.

I heard another grumbling from a flex guy, stating the 4a2b has a lot to do with all of the 10 guys sitting around getting paid to do nothing...

All hearsay, I won't believe any of it, until a bid closes, and guys start training.:cool:

KnightFlyer 12-03-2009 11:27 AM

I'm sure it's more than 10 guys, ha ha

MaydayMark 12-03-2009 11:38 AM


Originally Posted by Haywood JB (Post 720586)
I heard from one of the cmv classes, we are going to park some 40 Airbuses after the first.

I heard another grumbling from a flex guy, stating the 4a2b has a lot to do with all of the 10 guys sitting around getting paid to do nothing...


At a recent hubturn meeting, Capt "O" said we were parking all of the A310's except for the several A310-300's ...

The union recently settled the DC-10 vacation grievance. I found it rather interesting ... who would have guessed?


All times are GMT -8. The time now is 01:27 PM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands