New FCIF...AsiaOne Network Update...
Rumor going around the schoolhouse is that if you are going to HKG and have NOT started training yet, or are scheduled to start after June 1, you will be delayed until Jan, 2016.
Don't shot the messenger, I guess we will have the rest of the details by the end of the week. Just not sure which week :eek: Also, massive new bid with 350+ new captains, in all airplanes, coming out late next week. DO NOT GET DISTRACTED WITH ALL THE CHAOS AND CHANGES, keep your head in the cockpit!!! I hope everyone has plans to enjoy their summer vacation and spend lots of quality time with their family and friends. My MEC speaks for me. Peace out! PT |
Sorry....its not a FCIF, just an update on the main PFC home page. I'm sure someone would have corrected me. :p
|
767 is an example of cart before horse.
|
Originally Posted by MEMA300
(Post 1875311)
767 is an example of cart before horse.
Reference this link, look at Pg. 2 #7, the real kicker though is #11! A 100 hrs in the 75 AND 100 hrs in the 76 all within the first 120 days for consolidation just isn't doable with our schedules, esp. if your junior! http://www.faa.gov/documentLibrary/m..._8900._286.pdf Now the company knows how we (the pilots) feel when certain language is "interpreted" differently than the way they would like! :p |
Originally Posted by PurpleTail
(Post 1875319)
I do agree with you that the HKG aircraft transition was not completely thought through BUT in the companies defense (which I very rarely do) the new FAA rule change, in regards to common type rating requirements, went into effect on 3/9/15. I don't think the company could have anticipated such a drastic change from the FAA but it has thrown a huge wrench into their plans and they are having to adjust on the fly.
Reference this link, look at Pg. 2 #7, the real kicker though is #11! A 100 hrs in the 75 AND 100 hrs in the 76 all within the first 120 days for consolidation just isn't doable with our schedules, esp. if your junior! http://www.faa.gov/documentLibrary/m..._8900._286.pdf Now the company knows how we (the pilots) feel when certain language is "interpreted" differently than the way they would like! :p |
massive new bid coming out, HKG problems, 757 and 767 schoolhouse running at full capacity, all new hires to 757 or FDA...should be a fun bid and an even better training letter.
|
Bus guys still in HKG just had training dates slid 7 months
|
I want a new contract. Maybe I won't bid anything different on the next MOAB, maybe I'll stay part of the problem.
|
You can have a lean crew force....or you can have a concessionary contract. I think trying to do both is blowing up right now. The FAA just dumped a little gas on the fire removing some of the "efficiencies" the company hoped to capture with a single type.
Post MOAB training letter will be interesting. Going to take some offsite training ($$$) or putting folks on A300/MD11 (passover $$$) to make it work. Been getting beaten up on 0400 sims last two months, and that's with only the trickle of new hires rolling in... |
The 0400 sims are completely unsat. Especially when they are during the Maneuvers phase of training. This needs to change.
|
All times are GMT -8. The time now is 12:54 AM. |
User Alert System provided by
Advanced User Tagging v3.3.0 (Lite) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands