30/168 and X-day(s)
I had a couple x-days placed at the 8th day -168hr mark on my June schedule. I cannot move them in iCrew as I receive a “Violates Offday Grouping” message. I don’t see a 3-99-5 issue on my request.
Do we have our X-days placed on our schedule based on the 168 rule, and if so, when did that begin? |
PBS can award as many x days in a row as you bid for but once pref bid awards it we can’t move X-days around that create a conflict unless a conflict already existed via the bid awards.
|
Originally Posted by 717Alpha
(Post 2832671)
....we can’t move X-days around that create a conflict unless a conflict already existed via the bid awards.
|
Originally Posted by BCan
(Post 2832673)
The conflict now being 30/168?
|
I have over 3 days available. I tried to load most of my x-days at the end of the month because I’m moving. I have a couple odd x-days placed to what appears to solve the 30 hour off requirement. I’m unable to move them.
|
Are you creating another group of X days by moving them or trying to add them to an already existing group? After initial bids you can do the latter but cannot create a separate, additional group even if it’s within the number of X day groupings allowed.
Denny |
Originally Posted by Denny Crane
(Post 2832693)
Are you creating another group of X days by moving them or trying to add them to an already existing group? After initial bids you can do the latter but cannot create a separate, additional group even if it’s within the number of X day groupings allowed.
Denny Thanks Denny! |
I’m pretty sure you can reduce the number of X day blocks by adding to an existing group but you cannot increase the number of X day blocks. Once you do that, that’s how many blocks you have and you cannot go back to the greater number later if you change your mind.
Denny |
I’m not increasing blocks...i just want to combine two single xdays together, but neither x-day remained as scheduled. I’ll dig into the SRH.
I’ll try marrying one up without moving the other to see if PCS permits. TA |
Originally Posted by BCan
(Post 2832721)
I’m not increasing blocks...i just want to combine two single xdays together, but neither x-day remained as scheduled. I’ll dig into the SRH.
I’ll try marrying one up without moving the other to see if PCS permits. TA Denny |
All times are GMT -8. The time now is 02:51 PM. |
User Alert System provided by
Advanced User Tagging v3.3.0 (Lite) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands