Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Delta (https://www.airlinepilotforums.com/delta/)
-   -   Delta Air Lines 2Q15 Earnings Call (https://www.airlinepilotforums.com/delta/89428-delta-air-lines-2q15-earnings-call.html)

forgot to bid 07-14-2015 07:22 PM

Delta Air Lines 2Q15 Earnings Call
 
Delta Air Lines 2Q15 Earnings Call
Date: July 15, 2015
Time: 10:00 AM EDT

Live feed:
https://event.on24.com/eventRegistra...epage=register

Transcript:
If you sign up at seekingalpha.com you'll be able to access the transcript of the call once they've got it put up which last time was by 4pm.

Thoughts before, during and after?

notEnuf 07-14-2015 07:34 PM


Originally Posted by forgot to bid (Post 1929775)
Delta Air Lines 2Q15 Earnings Call
Date: July 15, 2015
Time: 10:00 AM EDT

Live feed:
https://event.on24.com/eventRegistra...epage=register

Transcript:
If you sign up at seekingalpha.com you'll be able to access the transcript of the call once they've got it put up which last time was by 4pm.

Thoughts before, during and after?

You've got this one, I have a 10 something report tomorrow. I'll be checking when I get to the hotel. Most of the details should be the same as the 7/2 investor update. The commentary from the Q&A will be priceless I'm sure.

http://www.sec.gov/Archives/edgar/da...7/delta_8k.htm

http://www.sec.gov/Archives/edgar/da..._8k-ex9901.htm

MtEverest 07-14-2015 07:52 PM

I fully expect "We don't comment regarding ongoing contract negotiations with our pilots".

That replaces "We have always had a close working relationship with our pilots, pilot risk has been taken off the table".

I would be surprised if they say anything about the EMB's either. Maybe "Nothing has been approved, next question".

forgot to bid 07-15-2015 05:52 AM

http://iliketowastemytime.com/sites/...ar_jump_in.gif

Lurking 07-15-2015 05:53 AM

Delta Profit Soars, Helped by Lower Fuel Costs - WSJ

Profits Double in 2Q

forgot to bid 07-15-2015 06:03 AM

Fuel hedging ***.

At least it's over.

forgot to bid 07-15-2015 06:05 AM

Best 2Q ever. 3Q will also be record breaking.


GOL.

bohicagain 07-15-2015 06:06 AM

Happy with the JV and looking for more partners = less wide body jobs


3.5% reduction in Q4 international flying


"Disappointed but will continue to work together" in regards due to the failed TA

forgot to bid 07-15-2015 06:08 AM

Disappointed in the pilots turning down the ta. Pilots have industry leading contract and are important. Paraphrase.

We run the absolute best operation in the world.

bohicagain 07-15-2015 06:09 AM

$ 411 million set aside for PS during 2Q


All times are GMT -8. The time now is 08:45 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands