Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   FedEx (https://www.airlinepilotforums.com/fedex/)
-   -   Where did all the Reserve lines go? (https://www.airlinepilotforums.com/fedex/114248-where-did-all-reserve-lines-go.html)

Cowbell 06-07-2018 01:16 PM

Where did all the Reserve lines go?
 
The July Airbus bid pack has 36 reserve lines for Capt. Previous months were June 55, May 56, April 48. I'm sure I missed the memo, but is there an explanation for this other than we suddenly have a lot more flying or lost a bunch of Captains? Standing by to be enlightened or ridiculed for my ignorance.

NoHaz 06-07-2018 01:38 PM


Originally Posted by Cowbell (Post 2610374)
The July Airbus bid pack has 36 reserve lines for Capt. Previous months were June 55, May 56, April 48. I'm sure I missed the memo, but is there an explanation for this other than we suddenly have a lot more flying or lost a bunch of Captains? Standing by to be enlightened or ridiculed for my ignorance.

Welcome to PBS. I think the new VTO process has moved much of R-lines to the secondary build.

EURO Capt Feb 28 lines 17 reserve and 11 secondary
July 32 lines 7 reserve and 14 secondary

NoHaz 06-07-2018 01:52 PM

Was there a re-interpretation of the contract or an agreement with the Sig to reduce r-days?

25.A.4 Unless waived by the SIG, at least 80% of all known reserve days, by
crew position, shall be built into reserve lines published in the bid period
package; however, all known R-24 blocks shall be built into reserve
lines published in the bid period package. Remaining reserve days will
be made available as reserve blocks, in the View/Add window, and
Secondary Working Window (SWW).

The Walrus 06-07-2018 02:12 PM


Originally Posted by NoHaz (Post 2610400)
Was there a re-interpretation of the contract or an agreement with the Sig to reduce r-days?

25.A.4 Unless waived by the SIG, at least 80% of all known reserve days, by
crew position, shall be built into reserve lines published in the bid period
package; however, all known R-24 blocks shall be built into reserve
lines published in the bid period package. Remaining reserve days will
be made available as reserve blocks, in the View/Add window, and
Secondary Working Window (SWW).

I think that we have seen 100% in the past and now with the new SLG process they are falling back to 80%,

NoHaz 06-07-2018 02:40 PM

Refer to FCIF. Not PBS. Enhanced bidding process SLG .. SoMany Lines Gone

Nightflyer 06-07-2018 02:57 PM

Backdoor PBS.

NC got played again.

MEMA300 06-07-2018 03:55 PM

LOL. We are the dumbest unionized work group in the US. Just to be clear. It’s embarrassing.

HoursHore 06-07-2018 06:01 PM

Back door pbs. Completely unnecessary to hide 20% of r lines to get rid of reserve conversion, but that's how it was sold.

Who defines "known reserve" anyway? Us or the company? Is there even a definition?

mempurpleflyer 06-07-2018 06:04 PM


Originally Posted by MEMA300 (Post 2610493)
LOL. We are the dumbest unionized work group in the US. Just to be clear. It’s embarrassing.

You ain’t seen nothing yet. Just wait till we voluntarily freeze one of the last remaining A Plans in America.

Key word is voluntarily

MelT 06-07-2018 07:05 PM

Yes, started last month in the 75 and was discussed. This sucks.


All times are GMT -8. The time now is 05:06 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands