Where did all the Reserve lines go?
#1
Where did all the Reserve lines go?
The July Airbus bid pack has 36 reserve lines for Capt. Previous months were June 55, May 56, April 48. I'm sure I missed the memo, but is there an explanation for this other than we suddenly have a lot more flying or lost a bunch of Captains? Standing by to be enlightened or ridiculed for my ignorance.
#2
The July Airbus bid pack has 36 reserve lines for Capt. Previous months were June 55, May 56, April 48. I'm sure I missed the memo, but is there an explanation for this other than we suddenly have a lot more flying or lost a bunch of Captains? Standing by to be enlightened or ridiculed for my ignorance.
EURO Capt Feb 28 lines 17 reserve and 11 secondary
July 32 lines 7 reserve and 14 secondary
#3
Was there a re-interpretation of the contract or an agreement with the Sig to reduce r-days?
25.A.4 Unless waived by the SIG, at least 80% of all known reserve days, by
crew position, shall be built into reserve lines published in the bid period
package; however, all known R-24 blocks shall be built into reserve
lines published in the bid period package. Remaining reserve days will
be made available as reserve blocks, in the View/Add window, and
Secondary Working Window (SWW).
25.A.4 Unless waived by the SIG, at least 80% of all known reserve days, by
crew position, shall be built into reserve lines published in the bid period
package; however, all known R-24 blocks shall be built into reserve
lines published in the bid period package. Remaining reserve days will
be made available as reserve blocks, in the View/Add window, and
Secondary Working Window (SWW).
Last edited by NoHaz; 06-07-2018 at 01:54 PM. Reason: spell check
#4
Was there a re-interpretation of the contract or an agreement with the Sig to reduce r-days?
25.A.4 Unless waived by the SIG, at least 80% of all known reserve days, by
crew position, shall be built into reserve lines published in the bid period
package; however, all known R-24 blocks shall be built into reserve
lines published in the bid period package. Remaining reserve days will
be made available as reserve blocks, in the View/Add window, and
Secondary Working Window (SWW).
25.A.4 Unless waived by the SIG, at least 80% of all known reserve days, by
crew position, shall be built into reserve lines published in the bid period
package; however, all known R-24 blocks shall be built into reserve
lines published in the bid period package. Remaining reserve days will
be made available as reserve blocks, in the View/Add window, and
Secondary Working Window (SWW).
#9
Gets Weekends Off
Joined APC: Mar 2017
Posts: 100
Thread
Thread Starter
Forum
Replies
Last Post