I am hearing the Monday drop will be:
MD-4 757-7 Airbus-7 |
Again no 76 and no more 77.. interesting. They must be backed up in training..
|
Originally Posted by 123456
(Post 2754271)
Again no 76 and no more 77.. interesting. They must be backed up in training..
|
They still hiring into 75 CGN or are FDA's filled up?
|
Originally Posted by uberkanon
(Post 2755412)
They still hiring into 75 CGN or are FDA's filled up?
CGN is full. HKG will have openings. |
Any update on today’s class drop?
|
7 A300
7 757 5 MD11 Caboose is 5029 |
Originally Posted by nwcrjca
(Post 2756660)
7 A300
7 757 5 MD11 Caboose is 5029 -UA |
Originally Posted by uberkanon
(Post 2755412)
They still hiring into 75 CGN or are FDA's filled up?
CGN full. There were 30 openings for HKG FO and only 14 went. I’m a little surprised they aren’t offering it for new hires Sent from my iPhone using Tapatalk |
Has FedEx had over 5,000 pilots in the past? Slowly approaching 3,000 at brown.
|
All times are GMT -8. The time now is 03:02 AM. |
User Alert System provided by
Advanced User Tagging v3.3.0 (Lite) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands