Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   FedEx (https://www.airlinepilotforums.com/fedex/)
-   -   Junior FDX reserve/line life on 757 (https://www.airlinepilotforums.com/fedex/86310-junior-fdx-reserve-line-life-757-a.html)

PA31 02-14-2017 07:54 AM

It is possible to switch an entire block of R days with someone else- but you have to find someone who wants to trade their block for yours. I did this last month with a guy I met on TNT jumpseat.

flysooner9 02-15-2017 10:50 AM

Can anyone share what a normal months schedule looks like?

Fdxlag2 02-15-2017 01:45 PM

You will be scheduled 15 out of 28 days a month 8 months a year and 19 out of 35 days 4 months a year. On reserve, in a 757, for an FO, in March, the blocks vary from 4 days to 19 days in length, with everything in between. March is a 35 day month for us. The 19 day block is at the end of the month so you could have the first 16 days off.

Sluggo_63 02-15-2017 11:52 PM


Originally Posted by Fdxlag2 (Post 2302413)
You will be scheduled to a maximum of 15 out of 28 days a month 8 months a year and 19 out of 35 days 4 months a year. On reserve, in a 757, for an FO, in March, the blocks vary from 4 days to 19 days in length, with everything in between. March is a 35 day month for us. The 19 day block is at the end of the month so you could have the first 16 days off.

Just a slight correction.


All times are GMT -8. The time now is 04:14 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands