![]() |
Standing bid is out....
The Ejet upgrade dropped to 3 months from DOH. Very close to street captains on the Ejet. I am sure if a new hire would have shown up with 1,000 hours 121 time, the upgrade would have happened.
The CRJ has basically the same upgrade timeframes. No wonder I see XJet and other regional FO’s coming over to Mesa. Interestingly, no Captain transfers from the CRJ to the Ejet or vice versa. |
Originally Posted by calmwinds
(Post 2645971)
The Ejet upgrade dropped to 3 months from DOH. Very close to street captains on the Ejet. I am sure if a new hire would have shown up with 1,000 hours 121 time, the upgrade would have happened.
The CRJ has basically the same upgrade timeframes. No wonder I see XJet and other regional FO’s coming over to Mesa. Interestingly, no Captain transfers from the CRJ to the Ejet or vice versa. |
Originally Posted by NovemberBravo
(Post 2645998)
There wasn’t a capt to captain transfer this bid. I’m thinking about it tho I want more cpp information
|
Sounds real safe there Mesa. I really want to fly with a very inexperienced captain. 3 month upgrades may sound great but I would not want to be on that aircraft!
|
Originally Posted by Hou757
(Post 2646028)
Sounds real safe there Mesa. I really want to fly with a very inexperienced captain. 3 month upgrades may sound great but I would not want to be on that aircraft!
Given that Envoy and SkyWest also have street captains, I think this is more of a statement on the industry in general than Mesa. |
Originally Posted by Hou757
(Post 2646028)
Sounds real safe there Mesa. I really want to fly with a very inexperienced captain. 3 month upgrades may sound great but I would not want to be on that aircraft!
|
Originally Posted by calmwinds
(Post 2646025)
Do you know why? I thought the contract required these and one per month would end up being the minimum awarded.
|
Originally Posted by 20sx
(Post 2646039)
1% of the pilot group per year. 12 last year and 12 more this year. Then, 20% of slots per standing bid. If there were no slots this bid, then I’m thinking we’ve hit 24 and there won’t be any more transfers until next year.
|
Originally Posted by Thunder Pig
(Post 2646033)
This isn’t Mesa specific. Just about every regional is upgrading at 1,000 121 hours. These 3 month upgrades are individuals coming from other 121 carriers.
A 175 program upgrading in 3 months is not the industry norm. Upgrading on a 145 or a CRJ in 3 months is pretty common. |
Sorry, but upgrading in 3 months in not safe. That is not the industry norm. I would say at least 18-24 months at a minimum with average flight time is more the norm.
|
| All times are GMT -8. The time now is 01:09 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands