![]() |
Silver Airways EMB145
I heard rumors Silver is transitioning to the EMB 145 and will need EMB 145 contract pilot.
Anyone know anymore about this or what contract agency Silver will be using and how far in the future this will take place? Thanks. |
Probably one final attempt at being attractive to new hires before shutdown. Commuting to IAD for saab reserve as a new hire is not acceptable to most people.
|
Originally Posted by sflpilot
(Post 2235293)
Probably one final attempt at being attractive to new hires before shutdown. Commuting to IAD for saab reserve as a new hire is not acceptable to most people.
|
Nobody is going to be commuting to IAD if hired today.
Also no on the 145s |
Originally Posted by PatrickBateman
(Post 2235589)
Nobody is going to be commuting to IAD if hired today.
Also no on the 145s |
Originally Posted by sflpilot
(Post 2235659)
Are all of the bases available immediately out of training (FLL TPA MCO) or only some. Also if you know how many people in each class are still being sent to IAD. Thanks
|
| All times are GMT -8. The time now is 09:38 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands