Quote:
Originally Posted by gzsg
They seems way too low to me.
Big surprise.
The triple 7 flying should have all been covered in the big bid unless they plan increased utilization or pilots leaving early are much higher than expected. We get 3 additional A330’s next year so that’s about 30 to 40 additional positions depending on routes. I have no idea on when the LATAM 350’s will enter service. If before summer they will need crews but I doubt we can get more than two or three flying by then. The 2 scheduled deliveries were also covered in the big bid.