Quote:
Originally Posted by Falconjet
Same for flexes as well. Why should they have to work the same number of days for less hours?
The line guys will get more days off with the lowered BLGs, so should the flexes.
FJ
The flex schedule is tied directly to the reserve days:
11.M.9.b. The maximum number of duty days on a flex instructor/PCA’s flex bid period schedule shall not exceed the maximum number of R-days in the bid period plus up to 5 days of carryover, if bid. Carryover days will be paid only if work is available, as determined by the appropriate training manager.
I think we should point out the language does say "maximum" and "encourage" training management to schedule something less than the maximum. This would also mitigate some of the overmanning as fewer bodies would be allowed to flex to the line.