BidX Pro and LAX : Read this!!!

Subscribe
LAX Guys -

There was an error in the way a few Trips were presented in the bid pack. Long story short, the effective date is supposed to match the zulu date of the first leg. On trips that begin between 0000 and 0015Z in LAX, the effective date is off by one day. The Textual bid pack shows it correctly, but BidX Pro interprets it incorrectly. When first imported, it is obvious there is a problem. When saved and reloaded, BidX "fixes" it, but has the date showing one day early for these trips.

Affected Lines : 1001, 1005, 1011, 1048, 2001, 2013, 2044, 2050, 2052, 2054
Affected Trips : 76, 78, 98, 99, 2006, 2008

Follow BidX Pro on Facebook for up to date info on all issues...

Thanks!
Reply
BidX 1.2.9 is available. It fixes a couple small issues (one badly parsed trip in the MD11 bid pack... 609 on line 1316). It does not fix the LAX issue, as that is a problem with the actual bid pack. LAX based pilots can find a fixed LAX bid pack on my website.

Cheers,
Paul
Reply