Still too many pilots
Amazing. Long summer coming.
MAY PROJECTED VRF AVAILABILITY: CLE-737-FO GUM-737-CA EWR-756-CA EWR-756-FO EWR-777-CA EWR-777-FO IAH-737-FO IAH-777-CA IAH-777-FO |
Originally Posted by APC225
(Post 974253)
Amazing. Long summer coming.
MAY PROJECTED VRF AVAILABILITY: CLE-737-FO GUM-737-CA EWR-756-CA EWR-756-FO EWR-777-CA EWR-777-FO IAH-737-FO IAH-777-CA IAH-777-FO Isn't it contractual when the LPV is below a certain value? |
I have 3 words....."Summer Time Flying"
Someone in MGT is going to get burned on this staffing model. Freddy, enjoy.....;) |
Originally Posted by EWR73FO
(Post 974260)
Isn't it contractual when the LPV is below a certain value?
|
Yes, these have to be OFFERED when the LPVs will be a certain value per the contract. However, the company does not actually have to AWARD any. May is not exactly summer flying. It is the calm before the storm for the most part. I still think we are understaffed even for the lulls if you ask me, though.
|
All times are GMT -8. The time now is 02:14 AM. |
User Alert System provided by
Advanced User Tagging v3.3.0 (Lite) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands