![]() |
How long after SLI before you had a joint bid
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
|
Originally Posted by R57 relay
(Post 1823473)
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
|
Originally Posted by R57 relay
(Post 1823473)
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
|
Originally Posted by MasterOfPuppets
(Post 1823554)
Every seat/base was biddable except for 747 and 787, and the first joint bid was within a week after SLI was finalized.
|
Originally Posted by pilotgolfer
(Post 1823568)
And all the Guppy left seats were full from 14-02V.
|
Originally Posted by pilotgolfer
(Post 1823568)
And all the Guppy left seats were full from 14-02V.
So I'm over it. It wasn't those individual pilots fault that management put out 14-02V, they were just taking advantage of a chance to upgrade before their actual seniority would have allowed it with a joint seniority list being in place. |
Originally Posted by R57 relay
(Post 1823473)
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
|
PG64,
Completely different vehicles but I agree, time to move on. All the best. |
Originally Posted by R57 relay
(Post 1823473)
I'm LUS. I was wondering how long it took after the SLI came out before you guys had a joint system wide equipment bid. Thanks.
|
Originally Posted by ShyGuy
(Post 1823592)
How long did it take at US/AWA?
|
| All times are GMT -8. The time now is 08:03 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands