Originally Posted by
LeineLodge
What determines whether a contract change must be put out for MEMRAT? Is it possible that this could be LOA'd into effect (not that I think any rep I've heard speak is dumb enough to do that) or would a large item such as this need to be voted on by the pilot group?
It is absolutely possible. There is no policy that would prohibit a scope sale outside of Section 6 to be done via LOA without MEMRAT. No policy to prohibit that whatsoever.
Carl