View Single Post
Old 07-11-2011 | 04:57 AM
  #70496  
Bucking Bar's Avatar
Bucking Bar
Can't abide NAI
 
Joined: Jun 2007
Posts: 12,078
Likes: 15
From: Douglas Aerospace post production Flight Test & Work Around Engineering bulletin dissembler
Default

Originally Posted by Pineapple Guy
I guess our mutual respect love fest may be ending.

Please provide a single example of this ever occurring. And remember, a grievance settlement doesn't count, as those have NEVER been sent to MEMRAT.
Sorry to disappoint, out of deference to your opinion I've withdrawn the offending allegation.

In our scope history, concessions have always remained one step ahead of what is needed to allow airplanes that have already been ordered. That's an awful lucky coincidence, isn't it?

Follow the history of small jet orders from 1999 to 2010 and place that beside a time line of contract revisions. The correlation is remarkable, but more remarkable when you consider the orders preceded the scope changes.

Last edited by Bucking Bar; 07-11-2011 at 05:08 AM.