d. be required to check his schedule via DBMS or VRU: 1) after block-in of the last flight segment of his rotation prior to his release (see Section 12 G. 13. - 14.), and 2) no later than 0200 base time on his first on-call day following a non-fly day, so as to be able to acknowledge: a) any assignment no later than three hours before a scheduled report of the rotation or start of a short call period, or
I thought when you called the vru it stamped the time on your Sched?