Originally Posted by
deadstick35
...and new SkyWest just signed on to fly 200s on a 3 year contract. When are the PSA 200 leases up? Not to make people paranoid or anything....
Oh, by the way, SkyWest was brought in by Midwest to replace Skyway before it was closed down.
I tried to resist but can't. The very first lease isn't up until 2017. Psa actually was cheaper then Skywest but due to a lack of structure out West the cost to start that up then exceeded savings. Straight from our VP of Ops. Sounds like had we had some more bodies and any West coast operation this flying would have been PSAs. But Skywest ultimately is flying this at nothing if not a loss as confirmed by J.O and our VP.....