Originally Posted by
Justdoinmyjob
How can a day with 19 required reserves and 50 available be capped?
Maybe there is a computer/pcs problem. I tried to do a swap with pot...4 day for 4day over the exact same dates. Denied after 2pcs runs for " does not meet contractual time limits " two schedulers and one supv. Couldn't figure it out. Oh and it was 3days in advance.