Originally Posted by
johnso29
Thanks for the tips. I started working with them about 4 months out. It's been going good. Last step from here is to wait and see how the Dec schedule turns out. Then some fine tuning can be done. It'll be a little tougher, as I think I'll be on reserve in Dec.
Just another reminder to bid what you want, and all that. FMLA (if I remember correctly) is pre-awarded credit which may help you get into the Line Construction Window and be a REG pilot for December with all the PCS flexibility that comes with NOT being a Reserve pee-on like me