There's a meeting tomorrow from which we'll probably get a feel for how soon the 72's are leaving. Something about an AD for cracks in the wing box costing too much.
The network plan as of 1/17/07 has no more scheduled lift for the 727's after 8/21/07.
Can anyone say "displacements"?