Originally Posted by
sailingfun
I told my reps what I had put in the survey and asked how what I put down compared with others. I was told I was right at the mean in the surveys. My upfront raise was 20 percent with ongoing 5 percent raises over the life of a 4 year contract. Total 40. I wanted a lot on the other items and I was told I asked more then most in those areas. My emphasis areas were increasing copilot pay to a 15 year scale taking the max up to 75 percent of CA pay. Sick leave back to the pre 1113 program, DC up to 18 percent, reserve pay 5 hours below ALV with a 70 hour minimum, Vacation and training pay and credit for line construction and actual pay with increases to 4 hours per day for both. Section 1 gross weight maximum reduced to pre LOA 46 weight with current contracts sunsetted. 6th week of vacation restored. Distributed training pays 1 for 1.
I tried to figure a value for all I ask for and am guessing it is worth about 3/4 of a billion per year by the end of the contract. Thats about half the cost of a true restoration contract. Some items such a pay and vacation becoming pay and credit would have to be phased in because they will require several hundred more CA positions. I would give them a 2 year phase in on items like that.
Do you believe your list of wants is achievable in this upcoming contract? If you want those things why do you spend so much time on these forums giving a multitude of reasons they wont be achievable?