Originally Posted by
syd111
Full authorization soon?? 2012, 2014 what is soon. Hey thx to all those ilots that keep doing the special assignment on all these things.
The test period for the FOM and FM runs from last Dec to this June. We should be able to remove the paper copies of these from our kits shortly after. Test period for Jepps will then run through Dec and we should be able to remove those from our kits shortly after.