Originally Posted by
tsquare
As in an asset swap? That makes sense since AMR (apparently) isn't filling that terminal and are (obviously) cash strapped. We build T4 and do a swap deal.. interesting. Prolly about the same money spent by both players, and we would get maximum utilization for that expenditure.
I think that tunneling idea was pretty cool though, but as I understand it you are correct about the water problems..
Not all trains need tunnels!
Saling is right,t T-8 has always been the best option for us. Arpy just did not want to play.