Originally Posted by
rk772
If I bid EWR 737 in new-hire training and then bid IAH during the summer bid, how long will it take to actually get down to IAH once the bid is awarded.
Also, how long to hold a line (737) in IAH.
I was hired Jan 06 bid EWR 737 and then figured out quickly that I didn't like commuting. I bid IAH in Aug and was advanced in Oct.