Originally Posted by
jeango
Hey guys,
Thanks for all the replies. I have an interview soon and would like to know if Saab 340 FO is still an option. Silver website says the need for both aircrafts. Thanks
Soon to interview
I was told by the chief pilot in the interview last week that they need 1900 crews right now. I'm scheduled for the July 9th class as a 1900 dec.