View Single Post
Old 07-18-2012 | 08:39 AM
  #8  
Mesabah
:-)
 
Joined: Feb 2007
Posts: 7,339
Likes: 0
Default

Originally Posted by Bucking Bar
Joe and Mesaba,

It is looking like a repeat of errors in C2K, when previous contractual commitments made the Delta PWA economically unenforceable. IMHO they should have merged the lists and ALPA should have fought for it.

I think we understand where this is probably going and it is unfortunate for ALPA members at Comair and the carriers Delta has some control over through bankruptcy.

Or, potentially nothing much happens. Under the PWA, "nothing" is an option. Perhaps it is the most viable option.
Correct, but Delta still has the ability to add 70 more 76 seat jets and can park or operate as many 50 seaters as they want, at any block hour ratio they want. The language in the PWA simply was not tight enough.
Reply