Originally Posted by
xjtguy
If you read the last JNC blastmail with the update, about 1/3 of the CBA was STILL being negotiated.
What I was told by a local rep was that although 1/3 is still open, only a few items were left to negotiate. Those few items, apparently, are associated with everything that is still open. Who knows, that's what they told me, probably wrong I'm sure. I'm starting to think we will all be long gone before this is ever sorted out. ExpressJet is the new US Airways.