Originally Posted by
Ottolillienthal
NO.
They had already furloughed those guys. Their letters were already mailed out. In the 11th hour they tried to bushwack the MEC by using their inside man (Dave Zullo), the Scheduling Chairman to negotiate a "furlough mitigation LOA", which was actually entitled "Joint Venture Flying."
Thanks for informative explanation.