Originally Posted by
GunshipGuy
11 days of reserve? Do you mean X-days? And why just 4 for Max short calls--does his month have 16-20 (or less) reserve days in the bid period out of the 31? Confused....
Went to look it up to show you why I'm confused with your numbers:
Dec is a 31 day bid period. So from the way I read the table under 12.N.7.a. there are 24 reserve days, and for 23-25 reserve days you get 10 X days. Or just go to the bid package and you see 11 X-days for the 24 days of reserve and the ALV of 74. That would mean 13 days on reserve, right? And from the table in 23.S.2.c. it looks like the max SCs are 5.
Short calls would be based on 23.S.2.c.2.a
31 - 7 vac - 2 CQ = 22 . . . 19-23 is 4 short calls
X Days based on 12.N.2.a
31 day month ALV less than 74:59
31 - 7 vacation days = 24
31 day month chart with 24-25 days = 11 X Days
24 days to bid - 11 X-Days = 13 days of reserve
13 Days of Reserve, 2 Days "on-call" removed for CQ
11 Days On Call for December
(CVG/MSP/NYC all get the 20% "extra X Day", so 10 Days on call for them)
Old PWA, the CQ days were prorated for the month before determining your place on the X-Day chart, so you stayed higher on the tables for days of work and short calls.
New PWA, CQ days are removed from your scheduled on-call days AFTER any pro-ration, and then once your month is done and CQ removed, THEN you count the days to determine Short Call max.