Thread
:
Min 5 per day (M5D) question
View Single Post
11-16-2012 | 08:10 PM
#
28
horrido27
Banned
Joined:
Feb 2011
Posts:
1,629
Likes:
0
From:
756 Left Side
Quote:
Originally Posted by
CAL EWR
I will say the new scheduling section to include the reserve section is light years ahead of the current CAL contract.
Jayson Baron
CAL Council 170 Chairman
20-K-6-f-(3)
Example: A Short Call Reserve whose assignment begins at 0600 and ends at 2000
may be released
from the assignment at 0700 and
given a flying assignment
that reports at 1700.
20-N-1-b
On the A380, B747, B777, B787, A330 and A350 fleets, for each Trip
the first lost day off shall not be subject to restoration
; however, the second and any subsequent lost day or days off shall be subject to restoration
20-N-3-b
Restoration shall be deferred if there are no future Trips
in the Lineholder’s
schedule, or if there is only one future Trip in his schedule and he opts to defer. Additionally,
the Company may defer restoration of the lost day off up to three (3) Bid Periods after the Bid Period in which the lost day off occurred.
Yupe, light years ahead~
Motch
NO Voter
Reply
0
0
horrido27
View Public Profile
Find More Posts by horrido27