Thread: Good bye ALPA
View Single Post
Old 11-19-2012 | 05:28 PM
  #23  
thor2j
Banned
 
Joined: May 2010
Posts: 244
Likes: 0
Default

Originally Posted by 89Pistons

It is absolutely true that the union prefers to have furloughees back instead of new hires off of the street at CAL. Most of the folks saying that furloughees need to get back sooner than later because the sky is going to fall are less than genuine in their concern.
Just playing devils advocate, say the isl gets done sometime the middle to end of next year. Latest forecast is 6-8 months. After it is finalized and a furloughee wants to come back it could be a long time. Since there will be no flush bid a vacancy must exist. If we hire 500 a year (optimistic) then it could be 2 years for some. If its less a lot longer.
Reply