Originally Posted by
johnso29
I believe their CPA with Us Air does not go beyond 2015. I could very well be wrong though.
According to an assistant CP, the flying could technically be over at any day; as soon as Airways pays back the loan money in its entirety, they could also yank the contract. This goes for extending beyond the 2015 cliff as well as ending it prior to.