Originally Posted by
Ultralight
Yes. The ERJ would be in response to specific requirements from mainline partners. Near-term need to win RFPs.
The MRJ is a longer-term thing, essentially a potential long-term replacement for the CRJ fleet.
SKW could end up with one, the other, or both. I seriously doubt we'll end up with only Bombardier products in the future.