View Single Post
Old 03-22-2013 | 06:13 PM
  #4  
Rock
Line Holder
 
Joined: Jan 2007
Posts: 1,201
Likes: 0
Default

Originally Posted by MaxKts
Here is a novel concept. Let the company introduce the 76 in a combined 75/76 bidpack. Up front they say everything will be at NB pay and you will only get WB pay if you actually operate a 76. They also have a system wide bid so no one can complain that their seniority was being abrogated. What could we do about it?
Call me crazy but I'd actually prefer that.
Reply