View Single Post
Old 04-08-2013 | 06:08 PM
  #15  
Nevets
Banned
 
Joined: Dec 2007
Posts: 2,934
Likes: 0
From: EMB 145 CPT
Default

Originally Posted by Nevets
I liked the way CCS worked (CAL's system)
Is CCS the same as PBS? Wasn't the CAL PBS system what gave PBS the bad name for the industry because they got hosed buy how it was implemented. I've heard nothing but negative thinks about theirs.
Crew Communication System: its CAL's proprietary scheduling interface. I only mentioned it because the poster I quoted was commenting on scheduling interfaces (crewtrac) rather than bidding systems.
Reply