Originally Posted by
Rama04
The page on APC says 140-180 hires in the next 6-8 months.
I was under the impression that over the first 12 month period, only about 115 could flow. Why hire 25-65 more than you need?
Thanks!
Flight time/Duty time regs and additional upgrades from other attrition.