Originally Posted by
jetlink
Correct me if I'm wrong, but isn't this bid part of this year bid effective 02-2014, hence 14-02A?
Well my smart answer is 02-2014 isn't this year, it's next year. I really didn't even think about when it was effective, it's just normally a year out. But the real point is that the 757 schedules are basically the same as the 737 schedules, but the 737 has more choices with scheduling, at basically the same pay. And no seat lock with the ISL over hanging. And the reason there are so many seats is because on the last bid, that had a lot of seats, none of them got filled and they rolled over to this bid plus whatever new seats were added.