Originally Posted by
johnso29
But FLEET is defined. And there are 3 conditions that all have to be met. Planes just sitting doesn't cut it.
Thanks.. just found that!
As of right now, the Pinnacle CRJ900s are supposed to be sitting on the ramp in MSP for a month if they comply with waiting for the 717 to come online.